Studio ··· Kruthica Architects, Hyderabad
Project Location ··· Siddapur, India
Year ··· Jan 2018 - May 2018
Project Location ··· Siddapur, India
Year ··· Jan 2018 - May 2018
Building with Earth
Role : Studying rammed earth and CSEB Block construction methods, and educating local farmers to build their school with this technology under the guidance of the associate architect. Further designed a stage block on the site and proposed to redesign the shutter for ramming earth during the construction of the stage block. Developed construction drawings for the stage block and the shutter.